01 / BASIN
Dust and heat
Loading unit model
starting
FOR REVIEW
One RPS unit, dropped into the conditions of each basin RPS runs in. The weather, light and grime change around it, and the callouts change with the site. It ties the 3D model to the "8 locations, 7 basins" story already on the homepage.
Every highlighted number is a realistic sample. Engine hours, uptime, output, fuel gas pressure, ambient and elevation all need real per-basin values from RPS before anything goes live.
The wellsite (rig, tanker trucks, pipe racks, vessels, tanks, pad) is simple procedural geometry and moves with the unit as one world. The camera orbits like a drone at about 20 ft. The model is an exterior-only slim-down of Oscar's export with flat paint colors, no textures. The engine was removed, so the enclosure has a dark interior block behind the louvers. Some small boxes under the silencer did not come through in the export.